New decks, rebuilds and repairs in wood or composite across Omaha, NE, with the frame and footings priced as plainly as the boards.(531) 233-3282
(531) 233-3282
Multi-tier cedar deck with built-in planters behind a two-story green house

Omaha Timber Deck Builders: Omaha, NE Deck Builder and Deck Contractor for Composite Decks and Deck Repair

Omaha Timber Deck Builders builds and repairs decks as an Omaha, NE deck builder and deck contractor, in wood or composite. A new deck usually runs $25 to $50 a square foot in pressure-treated pine and $40 to $80 in composite. We read every deck from the footing up. Boards are the part you see, and the frame is the part that holds you.

Request a quote

New deck, tired deck or one rail that wobbles? Give us the size and what is bothering you, and we call back with a rough number.

Your details stay with the crew who would build or fix this deck, and we use them only to call you back about it.

Most of the houses here in Omaha went up before 1980. Back then, a lot of the decks did not get a ledger flashing, which is a flashing that goes over the board that bolts or screws to the house. Without this, water can rot the house wall behind and create a lot of repair work.

  • New pressure-treated decks, $25 to $50 per sq ft installed
  • Omaha owners report 3 to 7 days for a tear-out and rebuild
  • Footing holes stay open until the inspector sees them
  • Ledger and flashing checked from below before any bid
  • Nebraska 811 ticket, two full business days before digging

Size times rate, on the back of an envelope

Typical prices per square foot for Omaha jobs. Your quote follows a look at the job.

$4,800 to $9,600

Call (531) 233-3282 for your price

At a glance

New deck, pressure-treated pine$25 to $50 per sq ft
New deck, composite$40 to $80 per sq ft
12x16 in pressure-treated pine$4,800 to $9,600 in all
New boards, frame stays$11 to $27 per sq ft
Typical deck repair$750 to $2,500
Omaha contractor licenseClass E or higher
Composite board warranty25 to 50 years, from the maker

Residential Deck Building, Repair and Replacement

Wood or composite, the frame gets the same questions.

  • Gray composite deck with black railing and outdoor seating in a fenced suburban yard

    Composite Deck Installation

    With composite deck installation, a few things can be different from using real wood. You need to pay attention to the joist spacing on the manufacturer's sheet. Composite usually isn't as strong, and it needs the joists to be closer together, especially if you're putting the boards on an angle. Touch the boards at the supplier first to get a feel of what your deck would feel like without shoes on. As an example, darker boards get hot in the afternoon sun.

  • Crew setting joists on the open frame of a new deck behind a house

    New Deck Building

    New deck building should always have a complete drawing first, which shows all of the footings, the posts and the joist directions, with all the measurements included. A typical new deck with a good crew can take about a week, which includes building the frame. It is always important that any beam posts sit on a concrete footing or a concrete pad that is a little above the ground grade, so that they don't sit in water and rot.

  • Screened porch with a couch and rocking chair, with pine trees beyond the screens

    Screened Porches

    A new screened porch usually runs $50 to $175 a square foot. We check whether the old frame deserves the work first, since a 25-year-old frame is a poor host for anything new on top.

  • Pressure-treated wood deck with stairs looking over a backyard in fall

    Wood Decks

    Wood decks here in Omaha weather can last a long time as long as some basic rules are followed, like never putting a wood deck right over mulch, as it could rot pretty quickly. It's important to leave a lot of air moving under the boards. Unsealed boards can turn gray pretty quickly and start cracking in years to come. For a rental or a tight budget, this is fine. There are over a hundred days below freezing, which means the water in the wood can freeze up and cause cracks.

  • Deck with boards cut out over the frame, new lumber and a nailer on the boards

    Deck Repair

    With deck repair, there are three layers to a deck, the finish coat on the top, then the deck boards themselves, and then the frame underneath that holds everything. Broken boards should always be removed and replaced, and then the whole deck refinished. Jabbing a screwdriver into the joist end on the house side determines if the wood is still sound or not. If the screwdriver stops, the wood is still sound. If a screwdriver sinks in, the frame is most likely rotting and would need to be replaced.

  • Covered wood deck with a ceiling fan and a dining table, with trees past the railing

    Covered Decks

    A roof changes the sums on a covered deck. Snow here averages 27.1 inches in a year. Expect a permit and more than one inspection.

  • Stained wood deck railing with post caps and two chairs, a neighboring house behind

    Deck Railing Installation

    Deck railing installation can be critical, especially if your deck is several feet off the ground. The 2018 IRC calls for a guard at least 36 inches high where a deck sits more than 30 inches above grade. The posts should go through the rim joist and be bolted to the joist to create a solid railing for years to come. If the post top wobbles, this means the fasteners are usually too small or not tight enough.

  • Old deck boards with the gray finish worn away and the grain split

    Deck Replacement

    Omaha's median house dates to 1974, so plenty of decks here are on their second or third life.

  • Dark pergola over a wood deck with a dining table beside a modern black house

    Pergola Installation

    Pergola installation is structural work, about 45 labor hours for a 120-square-foot wood one, and it runs high for that reason.

Commercial Deck Construction and Repair

Omaha enforces the 2018 IBC on commercial work, and its Class E license stops at what the residential code allows. Ask which class covers your building.

  • Apartment Deck and Balcony Repair

    We check apartment balconies from below, at the ledger and post bases, where a tenant never looks.

  • HOA Deck Replacement

    For an HOA deck replacement, we price each deck on its own line, from a survey of the frames, so the board can vote on the worst ones first and budget the rest for later years.

  • Restaurant Deck Construction

    Patio seating brings more people per square foot than a backyard does.

  • Office and Retail Deck Construction

    An office or retail deck gets the same footing questions as any other, plus access and the hours your doors stay open.

  • Rooftop Deck Building

    A rooftop deck sits on a roof membrane that has to keep working.

Specialty Deck Services

Smaller jobs and odd lots, each with one thing that decides how it goes.

  • Hand sanding a horizontal wood board before a new coat of finish

    Deck Staining and Refinishing

    Deck staining is a separate small trade in Omaha, and many builders hand it off. Scraping and recoating is the refinishing job, for a coat that has already let go.

  • Painted wood deck with short stairs and railings down to the lawn beside a sided house

    Deck Stairs

    The 2018 IRC caps a riser at 7 3/4 inches and asks for a 10-inch tread, and stairs that get squeezed in at the end can fail the final inspection on a frame that passed. A stringer held only by deck screws is a warning sign.

  • Low platform deck with wide steps on three sides, sitting on the lawn behind a white house

    Ground Level Decks

    We vent two sides so air moves under the boards. The 30-inch guard trigger is measured at the lowest grade near the edge, so a sloped yard can demand a rail on a deck that feels low. A floating deck still needs its permit question answered.

  • Raised walkout deck with black railing and a lattice skirt behind a brick house

    Multi Level and Walkout Decks

    The 2018 IRC shows hold-down devices rated 1,500 pounds at two points, or 750 pounds at four, on top of the ledger bolts. A multi level deck adds one more set of stairs to plan.

  • Worker on his knees marking a new board on a deck, a miter saw beside him

    Deck Resurfacing

    Deck resurfacing keeps the frame and swaps the top, about 14 to 15 labor hours for 120 square feet of boards. We'd skip it over any frame in doubt.

  • Hot tub on a covered deck with a railing, with water and houses in the distance

    Hot Tub Decks

    A hot tub on a deck is a load question, and full of water it is heavier than the party around it. Sometimes the better answer is a deck built around a tub sitting on its own pad, set into the boards.

Two deck bids that don't look alike?

One bid counts boards and another counts footings, so the totals rarely compare. Send what each one lists and the size of the deck, and we point out what is missing.

Omaha Deck Permits and the Contractor License

Omaha runs on the 2018 International Residential Code with local amendments, and the city keeps its own deck guidelines. An attached deck needs a permit.

Footing depth, by jurisdiction

Frozen ground lifts a shallow footing, and it never settles all the way back. Sarpy County’s amendments set a 42-inch frost line in the county’s own zoning area. Inside Omaha, get the figure from the city before anyone digs.

The license to ask about

Omaha code 43-272 wants a contractor license for work in the city and just past its limits. Deck work takes Class E or higher. Nebraska registration is separate, so ask for both.

Repair, Resurface or Replace: Read It From Below

About 60% of Omaha’s housing predates 1980, so many decks here went up before ledger flashing and hangers were routine.

Three answers

  • Repair: Sound frame, with soft boards or a loose rail.
  • Resurface: Sound frame, finished boards. In our view it pays only when the frame will outlast the board warranty.
  • Replace: Rot at posts or ledger, a ledger held by nails, or no flashing, which can mean a wet house rim.

Get a couple of different opinions on how sound all of the frame and posts underneath are. If they are in fine shape, go with the cheaper way of putting new boards on the old frame. That runs about $11 to $27 a square foot.

The Order of Work on an Omaha Deck

So one person stays your contact.

I had a neighbor years ago, and both our homes were built in the 1970s. I remember his deck off the back of the house was still the original deck and was rotting out to the point where he and his family were not allowed to walk on it. He left it that way for years. Then he finally hired the cheapest deck builder he could find. They tore out the old deck. But when the new one went up, it was not what the carpenter said he was going to do. There was nothing in writing, so he had nothing to go back on.

Start to final inspection

  1. Look underneath

    We measure, then read the frame and the house wall from below.

  2. Drawing and written estimate

    Tear-out, framing, stairs and rails each get a line, so two bids compare. Changes get approved in writing.

  3. Permit and locate

    The contractor pulls the permit, and Nebraska 811 marks the lines.

  4. Footings and frame

    The inspector sees the holes before concrete. Post bases sit above the footing.

  5. Boards and rails

    Boards get checked on delivery, and flooded or marked ones go back. The final inspection closes the permit.

Deck Build Times for Omaha Homes

Typical time by job

Job Typical time What sets the pace
Porch posts and rails About half a day Post count
New boards, 120 sq ft 14 to 15 labor hours Frame fixes found
Tear-out and rebuild 3 to 7 days Size and stairs
Wood pergola, 120 sq ft About 45 labor hours Posts and footings

Deck Cost in Omaha by Material

A 12x16 is 192 square feet.

Omaha deck prices by job

Job Typical range Priced by
New pressure-treated deck $25 to $50 Square foot
New cedar deck $30 to $47 Square foot
New composite deck $40 to $80 Square foot

| Wood boards, frame stays | $11 to $14 | Square foot | | Composite, frame stays | $22 to $27 | Square foot | | Screens, porch has a roof | $10 to $25 | Square foot | | Deck repair | $750 to $2,500 | Typical job | | Stain, two coats | $3 to $6 | Square foot |

| Wood pergola | $102 to $142 | Square foot |

Board, stain and pergola rows are for zip 68102, 2026, and the rest are national 2026 figures.

What moves the number

  • Stairs: New ones often run $1,400 to $2,600.
  • Posts: Each replaced post usually adds $150 to $500.

When wood is the right answer

A 192-square-foot deck costs about $2,900 to $5,800 less in pressure-treated pine than in composite. That gap buys roughly five or six rounds of stain at about $510 to $1,060 each.

When composite earns its price

If you are going to stay for many years, we believe it’s worth it to spend more on a composite man-made board. Composite doesn’t need staining or painting, where a wood deck should be treated often at a cost of around $510 to $1,060 each time.

Decks Across the Omaha Metro

Omaha Timber Deck Builders works across Omaha, NE, the Sarpy County suburbs from La Vista to Gretna, north to Blair, and over the river in Council Bluffs.

Douglas County, NE

  • Ralston
  • Bennington
  • Valley

Sarpy County, NE

  • La Vista
  • Papillion
  • Bellevue
  • Springfield
  • Gretna

Pottawattamie County, IA

  • Carter Lake
  • Council Bluffs

Washington County, NE

  • Fort Calhoun
  • Blair

Saunders County, NE

  • Yutan

Cass County, NE

  • Louisville
  • Plattsmouth

Millard and Elkhorn are annexed parts of Omaha, so a deck there goes through the city's permit office. Towns such as La Vista keep their own building office and local supplements, so each estimate starts with the address.

Omaha's contractor license reaches work three miles past the city limit.

Omaha Deck Questions, Boards to Footings

How much does a 20x20 deck cost in Omaha?

Usually $10,000 to $20,000 at the low-end lumber rate. A freestanding deck with no railings or stairs can drop to $20 to $25 a square foot.

How long does a deck last in Omaha?

Deck life in Omaha is typically around 20 to 35 years. What determines whether it lasts 20 or 35 is mostly how well it was taken care of and restained over the years.

Is a composite deck worth it?

Composite decking is worth it if you hate staining. The makers' warranties are typically 25 to 50 years, which cover the boards only, never the frame.

Do you need a permit for deck repair in Omaha?

It depends on what gets touched. Swapping a board tends to be treated differently from structural work, so ask the city's Permits and Inspections office before anyone touches joists or a ledger.

Who should pull the deck permit?

The contractor doing the work, and a builder who hands that to you is a warning sign. Omaha code 43-288 lets owners living in the home do their own work unlicensed, with permits and inspections still required.

Can you build a deck in winter in Omaha?

Yes, Omaha crews do build throughout the winter. Winter can be their slow time, so prices could be a bit cheaper than in the spring and summer.

How can I tell if my deck needs stain?

Sprinkle water on the boards. If it makes droplets, the old stain or sealer is still keeping the water out. If the wood soaks it up and turns darker right away, it needs a new coat of stain.

Do Iowa deck jobs follow the same rules?

No, Iowa towns run their own set of rules. Any out-of-state contractor would need to have a minimum $25,000 surety bond in order to work in Iowa.

We look under the boards first

A deck tells you most of its story from below: the ledger, the joist ends, the post bases. That look decides whether you need new boards, a new frame or a repair that holds for years.

Request a quote

Call (531) 233-3282 and talk it through, or put the deck's size and height in this form and watch for our call.

Your details stay with the crew who would build or fix this deck, and we use them only to call you back about it.

Call (531) 233-3282Price my deck